
Testing and commissioning
Device, circuit, interface and cause-and-effect testing with traceable commissioning records.
Commissioning that proves the complete fire safety sequence
We test devices, control logic and connected systems against the approved design, record every result and close defects before handover.
-
01Commissioning plan and document review We review approved drawings, equipment schedules and the cause-and-effect matrix, then prepare test sheets and the agreed witness sequence.
-
02Device, circuit and interface testing We test detectors, alarms, manual controls, loops, power supplies and interfaces to doors, lifts, ventilation, pumps, suppression and monitoring systems.
-
03Witness tests and defect closure We coordinate consultant, client, authority or class attendance, log failed items and retest them after correction.
-
04Results, training and handover We compile signed test records, configuration backups and outstanding items, then brief operators on normal use, alarms, faults, isolation and reset.
Brands we work with
Connected Applications And Solutions
Follow the application through equipment selection, interfaces and professional support.
Frequently Asked Questions
What do you need before commissioning starts?
Send the approved drawings, equipment schedule, cause-and-effect matrix, inspection records and the required witness or authority test dates.
Is testing and commissioning available in all countries?
Testing and commissioning is available in selected countries where we can meet local competency, certification and statutory requirements. Contact us to check your project.
What commissioning records will I receive?
We provide the agreed test sheets, results, defect and retest records, configuration backups, outstanding actions and operator handover documents.